i was in discussion with someone today and he propose a HP ML360 to replace my current server, it would come with dual xeon process, 2.0GB RAM, 2 X 73GB RAID 1 for the OS and 3 X 142GB RAID 5 for the file. we will also put in a new gigabit switch for the backbone, connecting the new and old servers, the firewall and adsl modem. The current ML150 server will be upgraded and use as a secondary backup incase the first server should fail. For a staff strength of 60 do you think this is good enough?